Park West: Industrial Park, Core and TI Master Planning, 2008 Size: 50,0000, Three Buildings Location: Modesto, California The core facilities within these high-bay industrial office buildings were poorly planned by the shell developer when initially constructed. Awkward, and out of date toilet facilities prevented the buildings and their suites to appeal the light-industrial / office leasing market. A master plan for the reconfiguration of these core facilities was developed, and then implemented on a case by case basis as the suites emptied. The suites were also planned for long-term conversion from Light-Industrial / Warehousing to Office and then back, in order to sustain the future marketability of this complex.