Paul Welschmeyer Architects 

View Flash Website

Pages:  Home | Residential | Commercial | Community and Historic Preservation | Energy Efficient Design & Green Building | Core Practice | Energy Consulting | Greenbuild Consulting | Ideology | Contact | Papers & Presentations | Awards & Publications | Links | Staff & Consultants | Paul Welschmeyer, Architect | Structural Engineering Consultant | Landscape Architecture Consultant | Interior Design Consultant | LEED Consultant | Building Science Testing - San Francisco Peninsula | Building Science Testing - North Bay | Building Science Testing - Sacramento | portfolio_key_images
Photographers:  Residential | Commercial | Community and Historic Preservation | Energy Efficient Design
Portfolios:  PARK WEST Light Industrial Office Park | WORLD VIEW TECHNOLOGY PARTNERS | SUTTER HEALTH Construction Office | CALIFORNIA NURSERY CO. Archives & Museum | BAYSIDE PLAZA Shell & Lease Ready Improvements | 454 Brannan Street | CYCORE Bay Area Office | DPR CONSTRUCTION Regional Office | ETRADE Data & Call Center | ETRADE Administrative Office | ETRADE Atlanta | SYNOPTICS Cafe | BAY NETWORKS Manufacturing | CITY ROCK Gym | APPLE Computer Valley Green 5 | APPLE Computer Valley Green 6

Commercial: SUTTER HEALTH Construction Office

  • Sutter Health Construction Office:  2002
Size: 4,000 s.f.
Location: Sacramento, California 

This is a permanent on-site construction office within the urban campus of the growing hospital, where there was no location for construction trailers. Expected growth and new construction will occur over the next seven years.

The existing shell space could not be altered and is comprised of three different constructions, each built in a different period of history, between the 1850s and 1950s. This space is a small part of a much larger historic structure.  With the exception of the minuscule windows on the street frontage, there was no natural light or visibility to the outdoors.  The interior environment needed to expand the perception of space and have a clear and simple design, which would counter-balance the cacophony of existing constructions.

    Sutter Health Construction Office: 2002 Size: 4,000 s.f. Location: Sacramento, California This is a permanent on-site construction office within the urban campus of the growing hospital, where there was no location for construction trailers. Expected growth and new construction will occur over the next seven years. The existing shell space could not be altered and is comprised of three different constructions, each built in a different period of history, between the 1850s and 1950s. This space is a small part of a much larger historic structure. With the exception of the minuscule windows on the street frontage, there was no natural light or visibility to the outdoors. The interior environment needed to expand the perception of space and have a clear and simple design, which would counter-balance the cacophony of existing constructions.



© Agency 2013 | Site Map | Paul Welschmeyer Architects | Powered by liveBooks